Gazprom Neft-Vostok and the Tomsk Region State Construction Supervision Inspectorate conducted a remote inspection of the gas-fired boiler house at the Urmanskoye field and issued a permit to put the facility into operation.
The inspection was carried out online using the Russian augmented reality platform IKSAR: an inspector based in Tomsk examined the facility in real time via an AR headset worn by an on-site operator.
The boiler house is equipped with modern automated systems and operates autonomously. The use of digital technologies made it possible to reduce inspection timeframes and logistics costs.
The inspection was carried out online using the Russian augmented reality platform IKSAR: an inspector based in Tomsk examined the facility in real time via an AR headset worn by an on-site operator.
The boiler house is equipped with modern automated systems and operates autonomously. The use of digital technologies made it possible to reduce inspection timeframes and logistics costs.